Fontaniva, Italy

project

1.14 The Kite

  • The main entrance of the school. Photo by Alessandra Bello

    The main entrance of the school. Photo by Alessandra Bello

  • Detail of the concrete made wall of the school entrance. Photo by Alessandra Bello

    Detail of the concrete made wall of the school entrance. Photo by Alessandra Bello

  • Detail of the north elevation. Photo by Alessandra Bello

    Detail of the north elevation. Photo by Alessandra Bello

  • The northe elevation. Photo by Alessandra Bello

    The northe elevation. Photo by Alessandra Bello

  • The south elevation. Photo by Alessandra Bello

    The south elevation. Photo by Alessandra Bello

  • The garden elevation. Photo by Pietro Savorelli

    The garden elevation. Photo by Pietro Savorelli

  • The kite hole. Photo by Pietro Savorelli

    The kite hole. Photo by Pietro Savorelli

  • The kite hole. Photo by Alessandra Bello

    The kite hole. Photo by Alessandra Bello

  • The kite hole, sketch © C+S Architects

    The kite hole, sketch © C+S Architects

  • The kite roof. Photo by Pietro Savorelli

    The kite roof. Photo by Pietro Savorelli

  • The garden elevation. Photo by Pietro Savorelli

    The garden elevation. Photo by Pietro Savorelli

  • The interior. Photo by Pietro Savorelli

    The interior. Photo by Pietro Savorelli

  • The interior. Photo by Pietro Savorelli

    The interior. Photo by Pietro Savorelli

  • Diagrams © C+S Architects

    Diagrams © C+S Architects

  • The side entrance. Photo by Pietro Savorelli

    The side entrance. Photo by Pietro Savorelli

  • The swimming pool's services. Photo by Alessandra Bello

    The swimming pool's services. Photo by Alessandra Bello

  • The swimming pool. Photo by Alessandra Bello

    The swimming pool. Photo by Alessandra Bello

  • The swimming pool. Photo by Alessandra Bello

    The swimming pool. Photo by Alessandra Bello

  • The swimming pool. Photo by Alessandra Bello

    The swimming pool. Photo by Alessandra Bello

  • The swimming pool. Photo by Alessandra Bello

    The swimming pool. Photo by Alessandra Bello

  • The services. Photo by Pietro Savorelli

    The services. Photo by Pietro Savorelli

  • Sections and elevations © C+S Architect

    Sections and elevations © C+S Architect

  • The interior. Photo by Pietro Savorelli

    The interior. Photo by Pietro Savorelli

  • Site plan © C+S Architect

    Site plan © C+S Architect

  • Model © C+S Architect

    Model © C+S Architect

  • Concept Sketch © C+S Architects

    Concept Sketch © C+S Architects

  • Illustration by Valentina Cocco

    Illustration by Valentina Cocco

  • Illustration by Valentina Cocco

    Illustration by Valentina Cocco

  • Illustration by Valentina Cocco

    Illustration by Valentina Cocco

1.14 The Kite

Fontaniva School Center

 

1.14 is a team, a group of educators, work to support families taking care of their children after the school hours and during holidays. 1.14 use a new pedagogical approach, which is different according to the age of the children: from 1 to 6 year old everything is worked out as a game.

They use an interdisciplinary approach: photography to learn how to look at things, theatre to represent ourselves and the world, languages and music to learn how to listen. The second group, 6.11 enables the kids to develop and empower the creative thinking: imagination is left free of manipulate and re-combine objects, spaces and sight views. 11.14 started initially as a support to school homework, but was immediately turned into a program of talent enhancement, where teen-agers are allowed to experiment their dreams and attitudes.

The owners of the school, who are also managing the program, worked with C+S believing that a ‘holistic approach’ could form the right space for the pedagogic aim, at the same time being in relationship with the environment, with the budget and with the short times of delivering.

This complex is the first of a series of interventions, which 1.14 has the intention to build in Italy to spread their vision.

1.14 the kite is a building formed around the pedagogical aims.

It is a big roof, a kite which has been captured during its flight to become the repair under where activities take place.

The building’s orientation towards south produces an opposite north opening which benefits of the shadow during summer time.

The kite is a thick concrete made structure, without any insulation working with its own thermal inertia to protect from the summer heat and creating a constant temperature inside the spaces.

The space inside is divided into two main parts: a bigger multifunctional space and a smaller space for the younger children. Each space has its own wcs and service spaces.

A series of labs, race tracks, sand arenas and swimming pools design the open-air space.

The pitched roofs of the buildings serving the swimming pools are made of solar and photovoltaic panels, which allow the pre-heating of the pool’s water in the mid-seasons and the heating of the inside spaces during the winter.

In this way the buildings generate a zero-energy and zero-emission system in perfect equilibrium with the environment. The concrete structure, coinciding with the form of the building, generated the ideal summer air-conditioning, without the necessity of any mechanical installation.

In the inside, the kite is enriched by color and matter. Its spaces are flexible and open

Color is used as a code, following C+S’ previous experience and the walls are turned into white-boards or lego-surfaces.

An eye was cut in the roof allowing to play with the shadows it projects either on the walls or on the grass. The inside spaces are visually connected to the outside through huge glazed sliding windows, to allow a continuity between what happens inside and outside.

A path is unfolded through the kite to connect all the different activities which can be activated.

Bibliography
  • C+S architects, Waiting for Flying, in: <<a+a>> n. 03-2014, pp. 48-51

    1.7 MB
Credits

Masterplan, architecture and landscape design: C+S Architects

Client: 1.14 Learning Centre

Site supervision and safety: Davide Testi

Structural engineering: Toso Riccio Ingegneria

MEP: Luca Bovo and Nicola Pizzo

C+S Team: Fabrizio Maiorana, Alessandro Pizzolato, Davide Testi

back to top